Park Home Disputes: Court of Appeal Widens Tribunal Powers

This article looks at the Court of Appeal case of Island Park (Medway) Limited and Residential Marine Limited v Mr Ian Dunkley and Anr [2026] EWCA Civ 1483 in which Lord Justice Miles gave the lead judgment which was handed down on 20 November 2026.

Jargon

The following terms are used in this article:

  • First-tier Tribunal: a specialist, lower-cost tribunal that handles park home disputes.
  • Jurisdiction: the power to decide a case.
  • Remitted: sent back to be decided again.
  • Covenant for quiet enjoyment: the promise that your use of your home won’t be interfered with.
  • Interim injunction: a temporary court order.
  • Protected site: a licensed residential park home site.

Background

In Rochester, Kent, there is a working marina called Port Werburgh that is owned by Residential Marine Limited (“RML”) (“the Marina”). The Marina, as well as being commercial in part, is also home to around 400 or so full-time residents of various houseboats and leisure barges.

There are two entrances to Port Werburgh; Gate A which takes a visitor through the Marina which is barred by an electronic gate that requires a fob. Gate B, which does not have any fob requirements, is a manual gate that is locked with a chain.

Within Port Werburgh, there is long and straight road that leads onto Island Park. Island Park is a mobile home site that is, effectively, located on an island in the middle of the River Medway (“the Road”). The Road is owned by RML.

In 2018, Mr and Mrs Dunkley purchased a mobile home on Island Park from RML.

In 2021, RML granted a lease to Island Park Medway Limited (“IPML”) relating to the entirety of Island Park and IPML became the ‘site owner’ from that point on (“the Lease”). IPML, under the Lease, agreed that anyone who derives benefit from the rights granted to IPML by RML under the Lease (e.g. to use IPML’s rights of way over the Marina), would comply with RML’s site rules.

RML has a set of site rules that govern any visitor who drives through the Marina, whether to access Island Park or not. One such rule is that a driver must wait for the electronic gate at Gate A to close (to prevent tailgating). Another is to drive at no more than 10mph (due to the large number of pedestrians on site). Should a visitor fail to adhere to the site rules, they are charged an administration charge of, currently, £20.00 by RML (“the Charges”) which reflects the time and resources it takes to check the CCTV in real time, prepare the charge notice and send it to the recipient etc.

Mr Dunkley did not agree that RML could charge him such sums and, as such, he refused to comply with the rules and would then not make payment. As a result, on one occasion years before, RML temporarily turned off Mr Dunkley’s fob to Gate A.

Mr and Mrs Dunkley issued proceedings in the First-Tier Tribunal (“the FTT”) as to whether IPML could impose the Charges against them under the Mobile Homes Act 1983 (“the 1983 Act”). 

The FTT

Regional Judge Whitney attended Island Park for a site visit and, on 14.02.25 when he gave his judgment, decided that as the Charges were imposed by an entity that was not a party to the 1983 Act and which also related to land that was not part of a mobile home site, the FTT had no jurisdiction to entertain the application. The application was therefore dismissed.

Mr and Mrs Dunkley sought permission to appeal from the Upper Tribunal (“UT”).

The First Appeal- the UT [2025] UKUT 393 (LC)

Judge Cooke found that the matters complained of arose ‘under an agreement to which the 1983 Act applied’ and so, regardless of the land in question being outside of a 1983 agreement, the FTT still had jurisdiction and had been wrong to find that it did not.

The judge found that, either IPML was enforcing the charges of RML or, if not, it was permitting RML to control the residents’ access to Island Park by refusing entry through Gate A. Judge Cooke found that issues of access was fundamental to the ‘amenity of the site’ and, as such, the FTT had jurisdiction against IPML under section 231A(4)(d) of the Housing Act 2004 (“the 2004 Act”) which significantly increased the nature of cases heard by the FTT and the UT under the 1983 Act

Where matters became interesting was when Judge Cooke added RML to the proceedings even though RML was no longer the owner of the protected site in question and had not been heard from below in any way until that point. It was a legally distinct and neighbouring landowner.

Judge Cooke, for justification, seemed to rely on IPML and RML being in common beneficial ownership (they shared some of the same directors) and, also, the fact that RML was the site owner when the Dunkleys purchased their mobile home in 2018. Judge Cooke found that it was not, in consequence, open to RML to impose obligations on IPML that would place IPML in breach of its duties as site owner. Judge Cooke found that such an issue also arose ‘under an agreement to which the 1983 Act applied’ and so, again, the FTT did have jurisdiction over RML.

Judge Cooke then went on to remit the matter back to the FTT (who had dismissed the matter on jurisdictional grounds without any findings of fact). Judge Cooke also added RML to the proceedings and then made an order essentially injuncting RML and IPML from entering any administration charges against Mr and Mrs Dunkley as a condition of access until the FTT had heard the remitted application.

IPML and RML sought permission to appeal from the Court of Appeal and was granted such permission on two and six grounds respectively.

Second Appeal- The Court of Appeal [2026] EWCA Civ 1483

The Court of Appeal dismissed all of the appeals made by both IPML and RML and upheld the UT’s order. There are several important takeaways for practitioners:

Firstly, as is well known, the FTT only has jurisdiction to hear cases that fall within the remit that is detailed at section 4 of the 1983 Act as extended by s231A of the 2004 Act. The court emphasised that it was wrong to say that the FTT only had jurisdiction over matters that occurred within the ‘geographic location’ of the protected site. Similarly, there was no ‘bright line’ that events occurring outside of the protected site could never constitute a breach of an agreement if the site owner had made itself legally responsible for such a breach.

Secondly, the clear intention of Parliament was that the 1983 Act should be given a very broad meaning as Parliament intended to transfer most, if not all, of mobile home related disputes to the FTT which has the expertise, was less formal and was also cheaper for residents to engage with when compared to a county court.

Thirdly, the court had to look at the contractual documentation and apply the usual rules of interpretation to each specific case. There was, on the particular contractual documentation in this case, a plausible argument that the 2018 agreement between the Dunkleys and RML related to some land that was outside of the protected site and that, if that’s correct, it would arguably have been a breach of covenant of quiet enjoyment if RML had prevented the Dunkleys from using Gate A.

There was no reason in principle why a site owner could not agree to give access to land outside of the protected site. In such a case, the court confirmed that there would be ‘no persuasive reason for concluding that section 4 should apply only to some parts of the agreement and not others’.

Accordingly, the right to use that land (which was still owned by RML) arose under an agreement that was subject to the 1983 Act and thus invoked the FTT’s jurisdiction so as to permit the UT to add RML to the proceedings.

Indeed, the Court of Appeal found that the UT had been right to add RML to the proceedings because there were ‘arguable questions or sustainable proceedings arising under an agreement to which the 1983 Act applied’ which are set out above.

Fourthly, the UT did have the power to impose interim injunctions (by another name) against the parties pursuant to its powers under section 231A of the 2004 Act. The court found that the section in question ‘was clearly intended to bestow substantive powers going beyond case management’.

What Does This Mean For You?

The Court of Appeal has made clear that the jurisdiction of the FTT to determine mobile home disputes is extremely wide and may be engaged so long as the question the FTT has to determine arises under an agreement to which the 1983 Act relates. This would seemingly be regardless of how tenuous the connection between the question itself and the 1983 Act agreement actually was.

Seemingly, this decision has greatly extended the scope of the FTT’s jurisdiction. It seems that even distinct and legally separate third-party landowners may now be brought under the jurisdiction of the FTT and made subject to its orders. This could happen when the occupier’s original mobile home agreement gave the occupier rights over the third party’s land which, for whatever reason, had now changed or was impacted at a future point in time.

The Court of appeal has also confirmed that the FTT has extensive and flexible powers to deal with such questions that may arise in the applications that it may hear under the 1983 Act.

It remains to be seen whether permission will be sought from the Supreme Court.

If you are a mobile home site owner, resident or neighbouring landowner and require legal advice on a dispute or the implications of this judgment, please contact Matt Champ or a member of our Property Dispute Resolution team at Colman Coyle.